320t Overhead Crane for Foundry | Overhead Crane for Foundry
This 320t overhead crane is the biggest metallurgical foundry crane ever made in Henan Province, China. Main structure of the 320t foundry crane is with 4 girders and 6 rails.
Read More >This 320t overhead crane is the biggest metallurgical foundry crane ever made in Henan Province, China. Main structure of the 320t foundry crane is with 4 girders and 6 rails.
Read More >This intelligent steel pipe distribution overhead crane is used to distribute steel-pipes in production line before the steel-pipes being sawed. It can transport steel pipes from one roller table to any places intelligently.
Read More >Rail-type container gantry crane is consists of the steel structure, lifting mechanism, micro-transfer mechanism, anti-sway system, travelling mechanism. Container Rail Mounted Gantry Crane can be used in inland terminals, container yard, rail freight station, coastal freight yard and frontier wharf.
Read More >
1. Construction Preparation
The supplier appoints professional and technical personnel to survey the construction site to remind the user to clarify the underground situation. Then deliver to the user the parking system foundation construction plan, construction drawings, and pre-embedded bolt positioning device, and completed the construction of the user's garage base.
2. Production
The final plan is further optimized for the type of parking system the user needs. Organize production, complete factory manufacturing, and standardize proper packaging. Make everything ready for shipment and installation.
3. Before Installation
Go to the local quality and technical supervision bureau to prepare for the installation notice, complete the installation preparation and agreement work, and arrange construction personnel and inspection personnel.
4. Installation
According to the plan to transport the equipment in place, according to the construction organization, for installation and civilized construction.
5. Inspection and Acceptance
After installation, self-test and re-test are performed according to the program. Report to the local quality and technical supervision bureau or special equipment safety testing institute for acceptance.
6. To Users
Submit the acceptance data to users and train the user's garage management and maintenance personnel. The marketing department transfer the project to the after-sales for maintenance, maintenance personnel to deliver garage-related information and guarantee measures documents. Keep contact for timely and reliable after-sales service.
More about car parking system: https://www.weihuacraneglobal.com/product/Vertical-Car-Parking-System.html