Weihua Crane supports the construction of "Hualong One" Hainan Changjiang Nuclear Power Pl

2024-01-08

Recently

Hainan Nuclear Power Base Phase II Project

Construction of No. 3 and 4 "Hualong One" units

Good news comes frequently

Weihua 450-ton gantry crane, etc.

Multiple sets of lifting equipment have been used safely and stably for many times

Completed the steam generator and reactor pressure vessel

Waiting for hoisting tasks of core equipment

Won the key "commendation" of China's nuclear power project

 

1704673191569253.jpg

Weihua 450t gantry crane at the steam generator hoisting site

"Hualong One" ZH-65 steam generator

In a single device in a primary circuit

The tallest, the largest, the heaviest, and the most expensive

High technical content in design and manufacturing

It can be called the best manufacturer of contemporary "nuclear power equipment"

Due to the small seating space

The lifting process must be smooth and precise

Weihua 450-ton gantry crane

Why can we meet such stringent requirements?

Excellently completed the hoisting task

What are the super powerful BUFF blessings

Precise positioning

The application of electrical anti-sway technology can reduce the amplitude of the swing by 95%, with a control accuracy of 2 mm, ensuring stability and accuracy during the lifting of nuclear island equipment.

Stable and safe

The hoisting mechanism is designed based on the single fault protection principle, with multiple safety protections and obstacle avoidance functions for upper and lower trolleys to ensure stable hoisting of the equipment.

Intelligent early warning

The safety monitoring system can timely sense the load, speed, position and other conditions during the hoisting process, and realize real-time collection, monitoring and intelligent early warning of safety data during hoisting operations.

 2024

Nearly a hundred sets of lifting equipment including a 130-ton spent fuel container crane

Will be delivered gradually

Used in Nuclear Power Unit 4

Hoisting and transportation of key equipmentIndustry

Continue to support my country’s nuclear power construction

Contribute hard-core strength to the implementation of the national "double carbon" strategy to ensure my country's energy security

Hainan Changjiang Nuclear Power Project

As a major energy project in Hainan Province, after the second phase of the Hainan Changjiang Nuclear Power Plant is completed and put into operation, each unit is expected to generate nearly 10 billion kilowatt-hours per year, which can meet the annual production and living electricity needs of a population of 1 million in Hainan Province. This is equivalent to reducing 3.12 million tons of standard coal and reducing carbon dioxide emissions by 8.16 million tons per year and planting more than 70 million trees.

Share:

Related Products

Chat Now
Email
weihua@craneweihua.com
Whatsapp
+86 13839050298
inquiry
Top
Share your lifting capacity, span, and industry needs for a tailor - made design
Online Inquiry
your Name*
your Email*
your Phone
Your company
Message*
X