Recently
Jiangsu Weihua Marine Heavy Industry Co., Ltd.
Successfully won the bid for Jiangsu Hailong offshore wind power high-end equipment project
A batch of lifting equipment including the first 3,000-ton and 1,200-ton gantry cranes in China
Based on the cooperation between the two parties on this project
Signed a long-term strategic cooperation agreement
January 25
Jiangsu Weihua Marine Heavy Industry Co., Ltd.
With Jiangsu Hailong Wind Power Technology Co., Ltd.
Organize strategic cooperation
And the signing ceremony of the first domestic 3,000-ton gantry crane
Zheng Yaojie, executive chairman of Weihua Group and chairman of Jiangsu Weihua
Li Haibin, Chairman and General Manager of Hailong Wind Power
Attend the signing ceremony

Zheng Yaojie, executive chairman of Weihua Group and chairman of Jiangsu Weihua, and Zhou Yiqing, general manager of Hailong Wind Power Home Port Manufacturing Department, signed a strategic cooperation agreement on behalf of both parties

Zheng Yaojie, executive chairman of Weihua Group and chairman of Jiangsu Weihua, spoke
Zheng Yaojie said
Jiangsu Weihua will make every effort to tackle key technical problems
And quality control work
From technology research and development to production and manufacturing
Fully develop project management and other aspects
Effectively ensure the high-quality delivery of complete sets of equipment such as 3,000-ton door operators as scheduled

Li Haibin, Chairman and General Manager of Hailong Wind Power, spoke
Li Haibin said
Jiangsu Weihua has obvious advantages in technological innovation
Has rich experience in marine equipment manufacturing
I hope that both parties can adopt a larger pattern and a higher position
Jointly empower the high-quality and sustainable development of the marine heavy industry
At the signing ceremony
Both parties expressed their opinions
Will give full play to their respective business strengths
In many fields such as offshore wind power and offshore engineering equipment
Realize resource sharing and complement each other’s advantages
Jointly promote the development of both parties’ products and services
Become a close partner to promote the development of the industry
The best partner to work together to create a powerful country
The first 3,000-ton gantry crane in China

3000-ton gantry crane adopts double trolley system
The lifting mechanism is a four-roller double-hook synchronous structure
The lifting capacity of a single trolley is 1,500 tons
Total lifting capacity 3,000 tons
Lifting height 120m
The whole machine trolley has single hook lifting and double hook lifting
Four-hook lifting and other lifting combinations
Can be used for various construction operations such as docking and lifting of large steel structures
It is the first set of products in China